Case study · AMAZIN Automation Solutions · 2024–26ALL SITES LIVE

Rolling out one enterprise SaaS platform to 25+ client sites

How I rolled out FIRLO from 1 pilot site to 25+ client sites with a 40+ member team, cutting time per truck from 10 minutes to 1.

  • Multi-site rollout
  • IoT
  • ERP/SAP

Context

FIRLO is an enterprise SaaS platform that automates vehicle movement, access control and weighment. It brings together RFID, cameras, weighbridges and the client’s ERP/SAP system.

What the sites were dealing with

Before FIRLO, most of the work at the gate and the weighbridge was manual:

  • Gate entries and weighbridge readings were written by hand or kept in Excel.
  • Trucks queued for a long time at the gate and at the weighbridge.
  • Weights could be tampered with. The same truck could be weighed twice, or a reading could be edited.
  • Nobody had a live view of which vehicles were inside the plant, or for how long.
  • Weighment data was typed into SAP by hand, which caused delays and mistakes.

The challenge

Take one platform live across 25+ client sites, where every site combined hardware, software and back-office integration, with many teams and third-party vendors involved.

My role

As Project Manager at AMAZIN Automation Solutions, I owned the rollout end to end.

How we did it

  • Pilot site first, then rolled out to the rest in batches.
  • About 1.5 years from the pilot to the last site.
  • 40+ people across development, DevOps, QA and IoT engineering, with 32 of them working on site.
  • Ran a Hybrid delivery model (Agile + Waterfall).
  • Kept the rollout on track with a site-readiness checklist, a rollout tracker and weekly client reviews.
  • Checked every change request for cost, time and people impact before approving it, and supported CAPEX/OPEX planning.
  • Trained end users, wrote adoption guides and handed each site over to the client’s operations team.

Outcome

  • Time per truck cut from 10 minutes to 1 minute.
  • Weight fraud stopped.
  • No more manual SAP entry. Weighment data now reaches SAP without anyone typing it in.
  • A live view of every vehicle inside the plant.
  • Fewer staff needed, which cut resource costs.
  • Grew from 1 pilot site to 25+ sites.
Narendra Kumar Gupta

Contact

Let's talk

Based in Gurugram (NCR). Email works best.